Case Study Ports · Logistics

Salt-corrosion safe. Electrically safe.

XO FRP scaffolds deployed across Dhamra Port for HVAC duct work and electrical maintenance — non-conductive + salt-air corrosion resistant for continuous coastal operation.

Client
Adani Dhamra Port
Adani Ports and SEZ — Dhamra
Sector
Ports
Marine Logistics
Location
Dhamra
Odisha, India
Deployment
XO FRP Scaffolds
HVAC + electrical maintenance
Outcome

Measurable impact across the operational footprint.

XO FRP
Scaffold Range

Deployed across terminal buildings, cranes, and utility plants.

Dual
Threat Rating

Non-conductive AND salt-air corrosion-resistant in one platform.

Year-Round
Operational

Works through monsoon and marine humidity without degradation.

01 · The Challenge

Coastal + electrical + continuous.

Dhamra Port's terminal infrastructure requires regular HVAC duct work and electrical maintenance — but the combination of coastal salt-air corrosion and live-electrical proximity ruled out aluminium.

Steel scaffolds would have corroded inside 12 months. Aluminium scaffolds met corrosion but failed the electrical-safety test. A single material had to do both.

Adani Dhamra Port site

XO FRP scaffold on-site at Dhamra Port terminal

02 · The Solution

XO FRP — the dual-duty scaffold.

Y Group proposed the XO FRP Tower — 7-layer fibreglass composite rails with UV-stable gel coat outer layer. ERDA-certified non-conductive, chemical-resistant to salt air, and dimensionally stable across temperature swings.

Deployment covered HVAC duct access in terminal buildings, electrical panel servicing in utility plants, and crane-top cable inspection — one material across every use case.

Key features deployed
  • check_circleXO FRP Tower — 7-layer fibreglass composite
  • check_circleUV-stable gel coat (decades of outdoor service)
  • check_circleNon-conductive ERDA-certified
  • check_circleSalt-air and chemical resistant
  • check_circleUp to 10 m working height
  • check_circleStandard BS EN 1004-1:2020 assembly
Deployment Gallery

On-site.

Hover any photo to read the caption.

Aluminium corrodes, steel rusts — FRP just works. Year after year. That's the test.

Dhamra Port Maintenance Lead
Related Deployments

Other sites where we earned trust.

Deploy on your site

Run the same playbook at your facility.

Y Group will survey your site, propose the right access equipment, demo on-site before purchase, and deploy across all locations. Lead time 7–14 days from 24 branches across India.